The brief

In autumn 2025, during an international basketball event in Riga, we were asked to create leisure areas for players in four hotel spaces for roughly three to four weeks. The greatest challenge was coordinating every part of the plan, each installation and each removal with the client's timetable. We wanted players arriving in their space to feel that their needs had been considered in advance.

3D scans and planning

We scanned the rooms in 3D before agreeing the layouts. The scans let us discuss exact equipment placement and clearances with the client and continue planning without returning to a hotel for every missing dimension. Measurements were available to approximately a centimetre, making the plan much more concrete than a rough floor sketch. A smaller earlier collaboration had also shown us how carefully a project of this length needed to be planned.

Activities in four hotels

The four spaces served different requests. In one Riga hotel, the group asked for only a golf simulator and table tennis, so those were its only game activities. The second location had four VR stations, air hockey, table tennis, cornhole and a PS5 station. The third had three VR stations, table football and a PS5 station. The fourth had approximately two to four VR stations, air hockey and a PS5 station. We also supplied a sound system, ambient lighting and beanbags in all four spaces.

Installation and daily support

Installation and dismantling had to fit both the client's and the hotels' schedules. Once the zones opened, our work continued throughout the project: the team checked and cleaned them several times each day, with instructors available around the clock for technical support. That kept the equipment ready while the organiser's team focused on the wider event.

The result

Players received an environment suited to their group, rather than an identical set of attractions in every hotel. We received positive feedback from participants. The organiser had one team responsible for planning and maintaining the entertainment areas. Coordinated schedules, precise room plans and regular support mattered as much to the result as the choice of equipment.

What to consider for a similar event

For leisure areas that must operate across several venues for weeks, start with each group's requests, room measurements and access windows. Then agree the sequence for delivery, installation and removal, and decide who will check the equipment each day. Here, the 3D scans helped settle layout decisions before setup, and one responsible team kept four different spaces running as a single project.